Aqua Attack
    Drilling & Reticulation Services


Home

Products

Profile of Bore

Completed Contracts

Getting A Quote

Links

Contracts in Progress

Contact Us
 
  Completed Contracts
 

St Stephens College - Carramar Campus



Stage 1Completed June 2001 -  included installation of 6 inch bore with 22kw submersible pump, full galvanised head gear, all associated electrical works housed in aluminium cabinet, two wire controller, 100mm high pressure mainline, irrigation to upper and lower school ovals.

Stage 2Completed February 2002 - extension of 100mm high pressure mainline and associated irrigation to common playing areas, carparks and verge areas, garden beds, etc.

Stage 3 - Completed November 2002 - Installation of a second bore and associated reticulation.  The bore included 200mm casing, 18.5kw Lowara submersible pump; 100mm isolation valves; hi and low pressure switches; galvanised discharge pipe; developing and test pumping and associated electrical works.

Reticulation included Century 80mm solenoid valves; Hunter I31 stainless steel gear drive sprinklers; Toro 570 series 75mm pop-up sprinklers. 

Stage 4 - Completed March 2004 -  Installation of a further 6 stations using Century 80mm solenoid valves with decoders; Hunter I31 stainless steel gear drive sprinklers; Toro 570 series pop-up sprinklers.

Stage 5 - Completed February 2005 - Installation of reticulation including Century 80mm solenoid alves with decoders; Hunter I31 stainless steel sprinklers; Toro 570 series pop-ups.

Peter Moyles Anglican Community School – Mindarie

Stage 2 - Completed February 2001 - extension of 100mm RRJ mainline, irrigation to oval and internal playing areas and garden beds.

Stage 3 - Completed January 2002 - extension of 100mm mainline; installation of Hunter gear drive borth I31 stainless steel and PGP sprinklers; Toro 570 series pop-ups both 75mm and 150mm;

Stage 4 - Completed October 2003 - Installation included Irritrol 50mm solenoid valves and associated wiring; Toro 570 series in both 75mm and 150mm pop-ups.

Bore No 2  and Stage 5 Reticulation - Completed December 2005 - Installation of a 6" bore drilled to 64 metres.  15kw submersible motor; developing and test pumping; 6m 6" telescopic stainless steel screen; associated electrical works including new cabinet and starter.

Hunter I31 gear drive sprinklers; 100mm RRJ mainline; Irritrol 50mm solenoid valves and associated wiring.

Regent Gardens Aged Care Facility,  Joondalup

Stage 1  - Completed November 2002 - installation of 80mm mainline; Hunter ICC 24 station controller; Irritrol 50mm solenoid valves and associated wiring; Toro 570 series 75mm pop-ups.

Stage 2 - Completed February 2004 - reticulation installed to 10 self contained units.

Stage 3 - Completed December 2004 - Installation of reticulation to self contained units and common areas; Irritrol 50mm solenoid valves, Hunter PGP gear drive  and Toro 570 series popups.

Regent Gardens Aged Care Facility - Booragoon

Stage 1 Bore & Reticulation - Completed January 2006

Installation of a 4" bore hole with 2.2kw pump and associated electrical works; Hunter gear drive sprinklers; sub terrane watering system; Toro 570 series pop-up sprinklers.

Avo Organic - Carrabooda

Commercial bore - completed June 2006

Installation of a 6" bore with stainless steel inline screen; Class 12 80mm pvc discharge column; associated head works; electrical cubicle with 15kw soft starter and associated electrical works.

Jacaranda Subdivision - High Wycombe 

Stage 1 Bore - Completed January 2005 - 6" bore with Grundfos 7.5kw submersible pump; developing and test pumping; low level sensors and pressure switches and associated electrical cabinet.

Castledare Retirement Village – Wilson

Installation of 4" submersible bore, 80mm ring main and all associated irrigation to common turf and garden areas, front and rear of individual townhouses.

Ledge Point Caravan Park

Completed September 2006 - Installation of two 4" bore holes with 2.2kw submersible pumps; associated electrical works; installation of a 50mm ring mainline; Irritrol 50mm solenoid valves; Hunter gear drive sprinklers; impact sprinklers on aluminium sleds.

 

To see each stage of how we put down a bore visit our photo gallery.

Address: 

15 Chalmers Court
Mindarie WA 6030

 

Phone: 

08 9300 8100  Mobile: 0400 124 550

 

Fax: 

08 9300 8150

 

Email: 

sales@aquaattack.com.au

 

Contact: 

Jose Domingues or Gary Griffiths